KDC completed construction for Chick-fil-A in Redlands, CA. The new building includes an expansion of the drive-thru from a single lane to a double lane and an addition of 526 sf to the building to increase storage space for an expected increase in drive-thru business.
![](https://kdcconstruction.com/wp-content/uploads/2023/10/01767-Citrus-Plaza-Final-Exterior-Front-1113x626.jpg)